GENERATOR CONTROL SERVICES

Engineering Support Built Around Generator Uptime

From difficult control faults to synchronization, retrofit, commissioning and periodic maintenance — GCX Power supports the complete generator-control lifecycle.

SYSTEM OVERVIEW
Generator Control & Synchronization
● HEALTHY
GENSET 01RUNNING GENSET 02STANDBY CONTROL LAYERPMS / SYNCkW • kVAR • Breaker • Logic UTILITY / BUSAVAILABLE SCADA / PLCONLINE
SERVICE CAPABILITY

Focused on the control and electrical layer of generator systems.

Control System Troubleshooting

For generators that fail to start, stop, close the breaker, communicate correctly or operate consistently.

Synchronization & Load Sharing

Diagnosis and commissioning of generator paralleling and power-sharing functions.

Commissioning & Recommissioning

Structured functional testing for new, modified or long-idle generator-control systems.

Controller Replacement & Retrofit

Migration planning when a controller is failed, obsolete or no longer supportable.

Preventive Maintenance & Health Checks

Periodic engineering inspection focused on controls and power-management readiness.

ATS / AMF & Breaker Control

Troubleshooting and testing of utility sensing, generator start, transfer and breaker-control sequences.

PLC / SCADA / PMS Integration

Integration of generator controllers into supervisory automation and power-management systems.

Remote Engineering Support

Pre-site diagnosis and guided troubleshooting where safe remote access and site support are available.

PERIODIC PREVENTIVE MAINTENANCE

A generator should be tested before the outage tests it for you.

Periodic control-system maintenance is designed to identify hidden configuration, communication, breaker and synchronization issues before they become emergency call-outs.

Typical control-system health check

HOW SUPPORT WORKS

A simple engineering process from first contact to documented handover.

01 — Assess

Collect controller model, alarms, drawings, operating history and site information before intervention.

02 — Diagnose & Plan

Define the likely failure area, testing approach, required access and any replacement/retrofit scope.

03 — Execute & Test

Troubleshoot, repair/modify where agreed, then functionally test the complete operating sequence.

04 — Document & Handover

Record findings, changes, test results and recommendations so the site is left with a clear technical baseline.

BEFORE REQUESTING SUPPORT

The right information can shorten troubleshooting time.

If available, send the following before a remote review or site visit:

NEED TECHNICAL SUPPORT?

A control problem should not become a prolonged outage.

Send the controller model, alarm details and site location. GCX Power will review the issue and define the next engineering step.

On-site & remote engineering support
Scroll to Top